This project was completed on September 26, 2025.
For questions or more information, contact UDOT's Region 3 office at 801-227-8000 Monday - Friday 8 a.m. - 5 p.m.
Project Description:
The Utah Department of Transportation (UDOT) resurfaced US-40 from the Antelope Creek Bridge to Pole Line Road (West Roosevelt) in Duchesne County. Project objectives were aimed at preserving the life of the roadway. This paving process helped increase the longevity of the road surface, increased skid resistance for vehicles, addressed roadway deterioration, and enhanced motorist safety by resmoothing the travel lanes. Additionally, crews upgraded various guardrails, refreshed lane painting/striping, and replaced roadside signage. Specific construction schedule updates were available on the right-hand tab.
Traffic control information was provided in the "Impacts & Updates" tab.
Paving Work East-Bound towards Myton near Mile Post 102 | 08-11-25
Paving Work East-Bound towards Myton near Mile Post 102 | 08-11-25
Asphalt-Patching Work near MP100 | 07-10-25