Study Overviews

The Utah Department of Transportation (UDOT) is conducting two studies in the Summit County and Wasatch County areas — the Phoston Spur Trail Study and the U.S. Route 40 Corridor Study. Due to the proximity of the study areas, the two study teams are working together to provide information to the public.

For more information about the Phoston Spur Trail Study and the U.S. Route 40 Corridor Study, visit the links below: 


Nearby Projects

For more information about a separate Summit County project, the Re-create 248 Study in Park City, click here to visit the Re-create 248 website.

Study Schedules

planned
planned
Phoston Spur Trail Study

Activities: 

  • Study begins – February 2025
  • Public meeting – Spring 2025
  • Study concludes – Fall 2025

planned
planned
U.S. Route 40 Corridor Study

Activities: 

  • Study begins – February 2025
  • Public meeting – Spring 2025
  • Study concludes – Early Summer 2026

Contact Information

Hotline: 385-446-8881

Email: us40area@utah.gov