UDOT is proposing a project to construct a section of raised concrete curb in the median along US-40 in Vernal, at the intersection of 1500 West.
This Study Is On Hold
This study has been put on hold as of July, 6 2026.
The need for a new concrete median at the 1500 West intersection will be reevaluated after improvements are made to the Aggie Boulevard and US-40 intersection by Vernal City. If you have questions about the plan and timeline for the Aggie Boulevard improvements, please reach out to Vernal City at 435-789-2255.
Questions?
Contact UDOT Region 3 at 801-227-8000
(Mon–Fri, 8 a.m.–5 p.m.).
Study Overview
The Utah Department of Transportation (UDOT) is proposing a project to construct a section of raised concrete curb in the median along US-40 in Vernal, at the intersection of 1500 West. If constructed, the raised curb would restrict left turns from 1500 West onto north or southbound US-40.
UDOT's goal is to reduce traffic conflict points, promote driver awareness, and improve safety at this intersection. The proposed project may also include the replacement of pedestrian ramps and addition of crosswalks on the north and south legs of the intersection to improve pedestrian access and safety.
Study Map
Schedule