October 19, 2023

Final walkthrough of the project will take place this week and next

Paving

Paving along the main roadway of SR-18 is complete. Some minor additional placement of asphalt along the roadway shoulder will take place in certain areas, and clean-up activities will occur such as evening out raised asphalt areas.

Striping

Roadway message signage will continue to be painted, and a second coat of paint will be placed on top of existing striping along the SR-18 main line roadway. This will take place the remainder of October.

Additional

Seeding for vegetation will take place this week and next.

 


 


Project Overview

The Utah Department of Transportation (UDOT) is improving the roadway on State Route 18. The work is divided into two areas: Ledges to Diamond Valley and Veyo to north of Central.
This project is a roadway asphalt rehabilitation project and will also make various improvements at different locations along SR-18, these include:

  • Pedestrian access ramps
  • Roadway and shoulder widening
  • Concrete barrier replacement
  • Dedicated turn lanes
  • Addition of two-way left turn lanes

Project Area Map