SR-16 | Rich County | Bridge Work

SR-16 | Rich County | Bridge Work

Overview

Project Overview

The SR-16 Bridge Work project will replace two bridges and several pipe culvert crossings in Rich County between Woodruff and Randolph. The bridge replacements are located at Francis Road south of Woodruff and over the Woodruff-Randolph Canal south of Randolph. The culvert replacements are located just north of Francis Road.

The goal of this project is to bring the bridges and culverts into a state of good repair while continuing to support safe, reliable travel for all users of the corridor.

UDOT is also paving SR-16 from the Utah/Wyoming border to the Randolph. The project will remove and replace asphalt in some areas while applying a liquid asphalt layer, chip seal, in others. This project will help to increase the life of the road.

Project Map

Map of the project area for the SR-16 bridgesMap of the project area for the SR-16 paving project

Project Timeline

Construction of the project is expected to begin in June 2026, with anticipated completion in Summer 2027. The project will have a winter shutdown in December 2026 and will return in Spring 2027.

 

Schedule

Work Hours: 7 a.m. - 5 p.m.

Workdays: Monday - Friday

No weekend or night work planned

Schedules are subject to change due to weather conditions and material availability.

Contact Information

To contact the public information team with questions or concerns:

Hotline: 855-925-2801 ext. 2400

Email: SR16bridges@utah.gov

 

Stay Informed

To receive weekly construction updates, please contact the public information team at the email address above and enter "Weekly Updates" in the subject line.

 

Project Timeline

live
live

Construction June 1

Woodruff Randolph Canal:

 

  • The project will begin forming the wingwalls, the retaining structures that extend out from a bridge abutment, and installing rebar. Monday, August 24, they will pour the concrete for the walls.
  • Asphalt removal is taking place in the east lane, both north and south of the box culverts to the project limits.
  •  

     

    Saleratus Creek (near Francis Road):

     

  • Wetland excavation has begun with hauling and placing clay and topsoil.
  • The project has installed speed reduction signs and motorists are advised to slow down and pay attention within the project limits
  • The project is driving piles, the long columns to support the new bridge. This work requires a crane that will pile drive these columns into a stable rock layer.
  •  

     

    UDOT is paving SR-16 from the Utah/Wyoming border to Randolph (see map below).The project is removing and replacing asphalt in some areas while applying a liquid asphalt layer, a chip seal, along the whole project corridor. This project will help to increase the life of the road.

    ?

    Project Activities:

  • The project is placing a fog seal, a light layer of liquid asphalt, along the finished sections of chip seal from the Utah/Wyoming border approximately 10 miles to the north. Permanent striping will follow the fog seal.
  • Sign installation in ongoing throughout the project corridor.

planned
planned

Project Completion

Summer 2027

complete
complete

Design

  • Design completed in March 2026.