This project was completed in November 2025.

For questions or more information, contact UDOT's Region 1 office at 801-620-1600 Monday - Friday 8 a.m. - 5 p.m.

Project Description

We carried out critical preservation work on the Mantua Bridge deck in both directions. This project was designed to extend the bridge’s service life and prevent the need for more extensive—and costly—repairs in the future. By addressing wear and tear early, UDOT enhanced safety, improved long-term travel reliability, and delivered cost-effective solutions for Utah taxpayers.

Construction began in late March. Since then, crews worked to remove deteriorated surface materials, perform structural repairs, and prepare the bridge for resurfacing.

During construction, lane closures were in place; however, at least one lane in each direction remained open at all times to maintain traffic flow. Drivers experienced delays, particularly during peak travel hours, and were encouraged to plan ahead, reduce speed, and exercise caution through the work zone.

 

A construction worker in orange, holding a bucket, is preparing to pave the Mantua Bridge. Cars and a mountain landscape is in the background.

Paving Prep Work looking WB 07/11/25

 

Side of the bridge view of approach slabs waiting to be installed.

Installed Approach Slabs (Looking West on the WB side) 06/26/25

 

Construction workers in the middle of the road between barriers reconstructing the bridge. A line of cars passes.

Mantua Bridge Reconstruction (Looking West on the EB side)  06/26/25

 

Four construction workers with power tools demolishing the mantua bridge deck.

Mantua Bridge Deck Demolition (Looking West) | 04/25/25

 

Mantua Bridge Project Map showing construction area. Text reads, "Bridge deck restoration; both directions."

Question title

Stay Informed

To receive occasional construction email updates, please enter your information below:

Schedule

complete
complete
Construction Start: March 25, 2025

Work Hours: Sunrise - Sunset

Workdays: Daily (Sunday through Saturday)

Schedules are subject to change due to weather conditions and material availability.

complete
complete
Construction End: November 2025