Overview

Project Overview

The Logan Main Street Y to X and 100 East to 200 East Connector Project focuses on designing and refining a roadway connection between the Main Street Y intersection at US-89/91 and SR-165, and east side streets such as 100 East and 200 East. The purpose of this project is to determine how this connection can be designed to: improve traffic flow and safety, provide reliable east-west travel options, better connect neighborhoods and local streets, and limit impacts to nearby properties and resources. While the connection concept has already been identified, many important design details are still being refined. 

The project team is in the early stages of advancing the alignment section for the connection by:

  • Refining and evaluating possible roadway alignments and layouts
  • Studying traffic operations and safety
  • Identifying utility, drainage, and property needs
  • Developing preliminary cost information
  • Coordination with local agencies and stakeholders

 

Project Map

Map showing proposed roadway alignment options highlighted in orange in the Maverik area along U.S. Route 91. The map is oriented north and includes major streets labeled 300 South, 400 South, 500 South, and 700 South, with 100 East and 100 West shown. Orange corridors indicate multiple possible alignments connecting U.S. 91 near 400 South and 700 South, including vertical and curving routes east of Main Street and near a river. Notable landmarks include The Riverwoods area and La Quinta Inn & Suites. A legend identifies orange areas as “Alignments in Consideration,” and an inset map shows the project location within the state.

 

Project Timeline

This schedule reflects early project development and design refinement. Specific timelines may adjust as the project progresses. 

Vertical timeline graphic showing key phases of the Logan Main Street Y to X and 100 East to 200 East Connector Project. The timeline is organized by year along the left side and uses alternating blue and orange blocks. 2025—“Main Street Transportation Study Completed,” identifying the Y to X and 100 East to 200 East connector as the highest recommended scenario. 2026—“Alignment Evaluation Occurs,” followed by “Alignment Refinement and Recommendations Complete.” 2027—“State Environmental Review.” Future—“Construction (Pending Funding and Approvals).”

Project Timeline

live
live

Alignment Evaluation: 2026

  • Alignment evaluation occurs
  • Refinement and recommendations anticipated to be complete late 2026

planned
planned

Next Steps

  • State environmental review is anticipated to begin in 2027
  • Construction will occur at a future date, pending funding and approvals

 

complete
complete

Project Milestones

  • Y to X and 100 East to 200 East Connector project included as highest recommended scenario in the final Main Street Transportation Study

Contact Information

To contact the public information team with questions or concerns:

Hotline: 435-361-4601

Email: LoganMainStreetYtoX@publicinput.com

Stay Informed

To receive project updates, please contact the public information team at the email address above and enter "Updates" in the subject line.