The Utah Department of Transportation (UDOT) is improving State Route 106 (SR-106) in Farmington between the US-89 interchange and 1700 South, and SR-225 (Park Lane) between the US-89 interchange and SR-106

This project will extend the life of the road and provide a smoother ride by removing and replacing the top layer of asphalt.  In addition to resurfacing the roadway the project will be performing the following:

  • Pedestrian crossings: Rebuilding and making modifications to ensure pedestrian sidewalk crossings meet current Americans with Disabilities Act (ADA) standards.
  • Pavement Soft Spots: Remove and repair pavement sections that have failed due to age.
  • Roadway signing and striping:  New signs and striping will be placed throughout the project limits. Striping improvements will be made specifically along SR-106, between Glovers Lane and 1700 South.

Please see below for the construction schedule and impacts.

Construction Schedule

Daytime work will occur when possible Monday through Saturday, from 7 a.m. to 7 p.m. Nightwork may be necessary to limit impacts to traffic. Utility relocations will occur overnight, between 11 p.m. and 6 a.m. The project is anticipated to be completed by Fall 2025.*

What to Expect

  • Increased dust, noise and vibration in the work zone

  • Traffic lane and shoulder closures with narrowed lanes

  • Temporary impacts to driveway/business accesses, mail delivery and trash collection

  • Sidewalk and pedestrian ramp closures and detours
     

UDOT appreciates your patience as we work to improve safety and mobility in your community. Please contact our team with questions or concerns:

  • Hotline: 801-340-7661 
  • Email: SR106Farmington@utah.gov

*Construction schedules are approximate and subject to change

 

 

Sign up for updates

Question title

Please fill out this form to receive email updates on the SR-106 Farmington Reconstruction project.

Schedule

live
live
Construction: Summer 2025 - Fall 2025

Work Hours: 7 a.m. - 7 p.m.

Workdays: Monday - Saturday

Schedules are subject to change due to weather conditions and material availability.

Utility relocation work will occur overnight from 11 p.m. to 6 a.m. to minimize traffic disruptions.