Project Overview
The Utah Department of Transportation (UDOT) resurfaced State St. from approximately 10600 S. to 9000 S. from May through summer 2023. This project resurfaced the roadway to extend the life of the pavement and reconstructed various pedestrian access ramps.
Schedule
This is hidden text that lets us know when google translate runs.