Traffic volume on Antelope Drive (S.R. 127) is expected to increase with the completion of the West Davis Corridor which will include an interchange at Antelope Drive between 3000 West and Bluff Road. As a result of this expected increase in traffic UDOT prepared a State Environmental Study (SES) to evaluate the widening of Antelope Drive at various locations west of 2000 West (S.R. 108).
Final SES
In the SES UDOT proposes to widen Andelope Drive between the West Davis Corridor interchange and 2000 West to include five lanes east of the interchange. A new traffic signal would be installed at 2500 West and right-turn lanes would be included at 2500 West and 2000 West. Each side would also have a 5-foot bike lane, 7-foot shoulder, curb, gutter, and a 5-foot wide sidewalk.