The Utah Department of Transportation (UDOT) is designing improvements for US-89 (300 South) in Provo between University Avenue and 500 West. The project's goals are to improve the roadway and underground infrastructure while providing better transportation options for all kinds of road users. The project will advertise in late 2023 with a planned construction start date in spring 2024.
The project plans to reconstruct the roadway between University Avenue and 500 West in a similar layout as previous projects on U.S. 89 in Provo (500 West and 300 South) have done.
 
The project team plans to improve the corridor by:
  • Replacing 300 South asphalt with concrete pavement
  • Upgrading the roadway drainage system with storm drain, curb and gutter
  • Replacing aged underground utilities including sewer and culinary water
  • Adding new pedestrian/bicycle crosswalks in several locations
  • Widening the sidewalk on both sides of 300 South
  • Reconstructing driveway approaches
  • Adding on-street bicycle lanes
  • Installing "bump-outs" on 400 West to reduce the crossing distance at intersections without painted crosswalks
  • Installing raised medians between blocks to improve safety
  • *In locations with existing buildings at the back of sidewalk, widening may be required if or when those properties are redeveloped.
 
The map below shows the project area.

UDOT, Provo City and the project team finished the project design since the open house in August 2022, in preparation for advertising the project in late 2023 with an anticipated construction start date in spring 2024.

 

 

live
live
Design

Summer 2023

planned
planned
Project Advertisement

Winter 2023

planned
planned
Construction

2024