9400 South | 1300 East to Wasatch Boulevard | Study

9400 South | 1300 East to Wasatch Boulevard | Study

Step 1

Study Complete

This study was completed on August 30, 2025.

Where do we go from here?

To move from a study to a construction project, the following steps must occur. (Timelines vary for every project):

  • Planning: The project is added to the Statewide Transportation Improvement Program (STIP).
  • Funding: The project is prioritized and receives funding.
  • Design & Construction: The project enters final design, followed by construction.

Questions?

Contact UDOT Region 2 at 801-975-4900
(Mon–Fri, 8 a.m.–5 p.m.).

 

1300 E Intersection

Potential Solutions

Please select "Yes" for each description of elements and concepts that you agree with below. Otherwise leave blank. Click on images to make them larger.

1400 East to 1700 East

Potential Solutions

Several near misses have been reported during Waterford’s
pick-up and drop-off times. In addition, angle crashes have
occurred at 1700 E. To improve safety, the following is
recommended:
• Limit the location of left-turn movements by implementing
left-turn lanes with center medians.

Yes
0%
Closed to responses

Provide a westbound flashing yellow arrow at 1700 E to
improve safety for vehicles turning left onto 1700 E.

Yes
100%
Closed to responses | 1 Response