Overview

Study Complete

This study was completed on November 4, 2026.

Where do we go from here?

To move from a study to a construction project, the following steps must occur. (Timelines vary for every project):

  • Planning: The project was added to the Statewide Transportation Improvement Program (STIP).
  • Funding: The project is prioritized and has received partial funding.
  • Design & Construction: The project enters final design, followed by construction.

Questions?

Contact UDOT Region 1 at 801-620-1600
(Mon–Fri, 8 a.m.–5 p.m.).

Supplemental Environmental Assessment (SEA) Finalized

UDOT published the SEA for agency and public review on July 23, 2026. Based on the information in the SEA, UDOT has determined that the Proposed Action would not have a significant impact on the natural or human environments and approved the Finding of No Significant Impact (FONSI) on November 4, 2026. 

Read the FONSI

In accordance with federal and state policy, UDOT responded to all substantive comments it received on the SEA during the official comment period. These responses are available for review in the Public Hearing Report.

Read the Public Hearing Report

Study Overview

UDOT prepared a SEA consistent with the National Environmental Policy Act of 1969, as amended, (NEPA) and 23 Code of Federal Regulations (CFR) 771 to evaluate whether proposed improvements to the transportation network at and around Interstate 15 (I-15) and 24th Street in Ogden, Weber County, Utah, would have significant environmental impacts. Collectively known as the 2026 Proposed Action, the proposed improvements include replacing the partial interchange at I-15 and 24th Street with a folded diamond interchange to provide northbound and southbound access to and from I-15 and making other changes to the local roadway and active transportation systems. 

This SEA builds upon the I-15; 24th Street Interchange Environmental Assessment (EA) and FONSI that UDOT completed in 2024.  UDOT provided copies of the 2024 documents for review. The SEA updated portions of the earlier environmental analyses to reflect the revised interchange concept design and, where applicable, provided information that is new or different from the 2024 documents. Generally, if a topic is not addressed in the SEA, then the information or data provided in 2024 was still relevant. The SEA’s formal comment period and public hearing occurred in July and August 2026.

The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being or have been carried out by UDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated May 26, 2022, and executed by FHWA and UDOT.

    Project Timeline

    Timeline showing four steps in the Supplemental Environmental Assessment (EA) process for the I-15 and 24th Street project. Step 1: Prepare Supplemental EA (Spring 2026). Step 2: Publish the Supplemental EA for public review and comment (Summer 2026). Step 3: Host a public hearing (Late Summer 2026). Step 4: Issue a decision (Fall 2026). The steps are presented left to right in chronological order. UDOT Pin: 15683

    Project Timeline

    live
    live

    This Study Is Complete

    complete
    complete

    Supplemental Environmental Assessment: Spring to Fall 2026

    • Prepare Supplemental EA: Spring 2026
    • Host a public meeting and comment period: Late Summer 2026
    • Finalize EA and issue a decision: Fall 2026 
    • Publish the Supplemental EA: Summer 2026